Illustrative render of a white electric Class 8 semi truck in a dark studio
All models

Class 8 electric truck

Semi

2017 unveiled / 2022 – presentIn productionClass 8 tractor unit, 2 seats

The electric truck that hauls 82,000 lb.

Overview

Tesla's Class 8 truck: three independent motors on the rear axle, under 2 kWh per mile, and a promised 20-second 0–60 mph fully loaded where a diesel takes about a minute. PepsiCo took the first customer trucks in December 2022.

The story

Tesla showed the Semi in November 2017 and promised a truck that would cost less per mile than diesel, accelerate like a car when empty and still haul 82,000 lb. It then went quiet for five years.

PepsiCo finally took delivery of the first customer trucks on 1 December 2022 at its Modesto bottling plant, and used them on real routes — including the run from Modesto to Sacramento, 425 miles round trip. Early data showed the trucks returning roughly 1.7 kWh per mile loaded.

In 2026 the Semi moved from pilot to volume order books: pricing was published, Megacharger installations scaled with fleet depots, and ZET SCALE — a partnership that includes Microsoft and PepsiCo — placed a 2,500-truck order, doubling the US electric Class 8 fleet and making it the biggest electric truck order ever placed.

Full specifications

Powertrain

Motors
Three independent motors on the rear axle, Model 3-derived
Layout
Rear-axle drive with independent torque per motor
Energy use
Under 2 kWh per mile — claimed roughly half a diesel's energy cost per mile
Battery
Structural pack under the cab and trailer link

Performance

0–60 mph
About 20 s fully loaded, versus around 60 s for a comparable diesel
Gradeability
Maintains highway speed on a 5% grade fully loaded
Gross combination weight
82,000 lb
Brakes
Regenerative braking handles most deceleration; air brakes as backup

Charging

Megacharger
Over 1 MW DC; up to 70% in around 30 minutes
Site equipment
On-site charging from $40,000 for a minimum of two
Deployment
Megachargers installed at fleet depots rather than public sites

Cab

Seating
2 seats, centre driving position
Displays
Twin touchscreens flanking the steering wheel
Safety
Automatic emergency braking, surround cameras, electronic stability control
Efficiency features
Extended roof fairing and aero work on the Long Range truck

Production

Unveiled
16 November 2017
First customer
PepsiCo, deliveries from 1 December 2022
Built at
Gigafactory Nevada and a dedicated high-volume line in Nevada
2026
A 2,500-truck order from ZET SCALE, a Microsoft and PepsiCo fleet partnership — the largest electric Class 8 order ever placed

Records and firsts

  • The first electric Class 8 truck to enter service with a volume customer fleet (PepsiCo, December 2022)
  • The largest electric truck order in history — 2,500 units, announced 2026
  • Claimed energy use under 2 kWh per mile, roughly a fifth of a diesel truck's fuel energy
  • First Class 8 truck designed around a megawatt charging standard

Every version

VersionYearsPriceNotes
Standard Range2026–$260,000325 miles, aimed at regional routes
Long Range2026–$290,000500 miles, extended cabin and roof fairing
2017 reservation spec2017$150,000 / $180,000The original 300-mile and 500-mile announcement
TTesla Archive

A complete, in-order record of every car Tesla has built — from the 2008 Roadster to the Roadster revealed in October 2026 — with its prices, numbers and the Master Plan it came from.

On this site

Sources

An independent enthusiast archive. Not affiliated with, endorsed by or operated by Tesla, Inc. Model names and figures belong to their owners.

Prices are US figures as published by Tesla and dated October 2026; they exclude taxes, title, registration and incentives, and Tesla changes them often. Images are AI-generated illustrative renders, not photographs of the real cars. Specifications were compiled from Tesla's own model pages and Master Plan documents, Wikipedia's model records and 2026 press coverage.